
love and recommend Ortekor
Kids Smartwatch | 4G GPS Tracker with Waterproof Design & Camera | Real-Time Location Updates for Active Play
Kids Smartwatch | 4G GPS Tracker with Waterproof Design & Camera | Real-Time Location Updates for Active Play
In stock
Couldn't load pickup availability
USPS
Kids Smartwatch: Stay Connected and Active
The Kids Smartwatch is a versatile 4G GPS Tracker designed to keep children connected while encouraging an active lifestyle. With real-time location updates, two-way video calling, and a user-friendly touchscreen, this smartwatch is perfect for daily adventures. Its durable IP67 waterproof design ensures it can handle splashes and outdoor play, giving parents peace of mind.
Key Features
- Real-Time GPS Tracking: Always know your child's location with accurate updates.
- Two-Way Video Calling: Stay connected through live calls with built-in 4G support.
- IP67 Waterproof Rating: Safe for outdoor play and rainy days.
- Built-in Camera: Capture and share moments with ease.
- Activity Tracker: Promotes healthy habits with step counting.
Specifications
- Display: 1.4 inch (3.56 cm) colour touchscreen, 240×240 px resolution
- Water Resistance: IP67 certified – safe for splashes and brief immersion
- GPS Accuracy: Tracks location within 3–10 metres (9.8–32.8 ft)
- Battery: 680 mAh rechargeable battery, lasts up to 3 days
- Size: 4.2 x 5.3 x 1.6 cm (1.45 x 2.08 x 0.65 in)
- Weight: 55 g (0.12 lbs / 0.055 kg)
- SIM Support: Nano SIM, 4G compatible for full connectivity
What’s in the Box?
- 1x Kids GPS Smartwatch
- 1x USB Charging Cable
- 1x User Manual
- 1x SIM Tool
Shipping Info
Shipping Info
Our delivery time is 2-5 business days and our processing time is 1-2 business days. You will receive a delivery confirmation when your order has been dispatched from our warehouse. You will then receive a tracking number and a link to track your shipment.
Refunds
Refunds
We have a 30-day return policy, which means you have 30 days after receiving your item to request a return.