Skip to product information
1 of 10

Ortekor Pet Tracker Series | GPS Cat Collar with Real-Time Location Updates | Lightweight Design for Cat Safety

Ortekor Pet Tracker Series | GPS Cat Collar with Real-Time Location Updates | Lightweight Design for Cat Safety

Regular price $60.45 USD
Regular price $65.95 USD Sale price $60.45 USD
Sale Sold out

In stock

🇺🇸
Free US Shipping Delivered in 2–5 Business Days
USPS USPS

GPS Cat Collar for Real-Time Location Monitoring

The Pet Tracker is designed to provide peace of mind for pet owners by allowing real-time monitoring of your cat’s location. With its compact and lightweight design, it ensures comfortable wear while delivering reliable GPS tracking updates directly to your smartphone.

Key Features

  • Real-Time Tracking: Provides instant location updates via smartphone
  • Lightweight Design: Comfortable and unobtrusive for daily pet wear
  • Accurate Location Data: Helps monitor and protect your pet effectively
  • Easy Setup: Quick installation and simple app connection
  • Rechargeable Battery: Long-lasting power for continuous tracking

Specifications

  • Material: Durable ABS housing
  • Dimensions: 2 cm × 2 cm compact design
  • Battery: Long-lasting rechargeable battery
  • Connectivity: GPS-enabled real-time tracking system
  • Use Case: Designed for cat safety and outdoor monitoring

Shipping Info

Our delivery time is 2-5 business days and our processing time is 1-2 business days. You will receive a delivery confirmation when your order has been dispatched from our warehouse. You will then receive a tracking number and a link to track your shipment.

Refunds

We have a 30-day return policy, which means you have 30 days after receiving your item to request a return.

View full details